January 2013
Parking Structure Project
P age 40
Features
C
B
h
40 P A rooftopsparking structure project during one of
arking
truCture
rew
eats the
eat
Southern California's longest-lasting heat waves puts
this coatings crew in the proverbial hot seat
46
rooF Coatings Crew keePs its Cool
High winds, searing temperatures, and a tight
deadline on a 180,000-square-foot (16,722.55 m2)
roofing project makes this Arizona team feel like a cat
on a hot tin roof
52
Med Center ConCrete Cure
74
PiPeline rehaB À la Carte
speCial seCtion
60
C oMPany P ro File 2013
Take a closer look at some of the key players from
all aspects of the coatings industry.
never again
80 Coatings Failure analysisGalvanized
Avoiding coating failures on Hot Dip
(HDG) metal begins with understanding process.
This Connecticut coatings crew doctors up a set of
blueprints before applying 55,000 square feet
(5,109.67 m2) of coatings at a new-build medical center
on tHe WeB
Operators at a Southwestern power plant are hungry
for a quick fix when their underground cooling
system shows signs of failure. This coatings crew
serves up a crazy-strong epoxy sandwich—and that's
just the main course
On the COver (A) g Coatings crew doctors blueprints to help find Rx for med center floors.
WWW.CoatingsproMag.CoM
Follow us on:
—Photo courtesy of Dur-A-Flex
TM
On the COver (B) g It's hard for a crew to keep cool while coating a metal roof in the desert.
—Photo courtesy of Heat Guard Today
8 CoatingsPro
g
January 2013
facebook.com/CoatingsproMag
twitter.com/CoatingsproMag