CoatingsPro Magazine

CPRO_JAN2014

CoatingsPro offers an in-depth look at coatings based on case studies, successful business operation, new products, industry news, and the safe and profitable use of coatings and equipment.

Issue link: http://coatingspromag.epubxp.com/i/235725

Contents of this Issue

Navigation

Page 81 of 116

Cruise Terminal Restoration To prepare the damaged surface, the floors needed to be brought up to International Concrete Repair Institute (ICRI) concrete surface profile (CSP) 3 standards as specified by Dur-A-Flex, the chosen coatings manufacturer for the rehab. During its frst year of operation, Brooklyn Cruise Terminal welcomed 40 ships and added 330 new permanent jobs to the immediate waterfront area. COATINGSPRO JANUARY 2014 81

Articles in this issue

Archives of this issue

view archives of CoatingsPro Magazine - CPRO_JAN2014