CoatingsPro offers an in-depth look at coatings based on case studies, successful business operation, new products, industry news, and the safe and profitable use of coatings and equipment.
Waterproofing a Park Deck
Waterproofing on this job was imperative,
as the park deck would be even with the
street level, and the freeway would flow
freely via tunnel under the park deck.
The 22-person crew worked in teams to attack this Texas
Department of Transportation job. To start the 18-month-long
project, the crew caulked, power-washed, and detailed all
pre-cast concrete pieces.
COATINGSPRO JANUARY 2014
87