Unbeetable Jobsite Access
W hen Scottsbluff-based Eric Reichert Insulation &
Construction, Incorporated (ERIC) won the bid for this
~28,500-square-foot (2,647.7 m²) project, supervisor Andrew
Rein could barely contain himself. ERIC had previously
performed construction work at the Scottsbluff plant, and Rein
was eager to demonstrate his crew's insulated-coatings prowess.
"We always give our best on every job but definitely treated
this one as a ' foot in the door' insulation project," said Rein.
Rein had another reason to like this project: WSC's facility
sits two short blocks from the ERIC shop. Hey, who wants to see
a competitor's work truck at a jobsite so close to your shop you
56 SEPTEMBER 2016 COATINGSPROMAG.COM
For Eric Reichert Insulation & Construction, Inc. (ERIC), the coating of
nine tanks for a beet sugar processing facility was sweet! To start, the
crew blasted the tanks using a Graco EcoQuip and HOLD*BLAST.
The project crossed eight weeks and ~28,500 square feet (2,647.7 m²) of
new carbon steel with mill scale and surface rust. And the project was
only two blocks from the crew's shop!
Tank Insulation Coating
Wr i te in Re ad e r In q u ir y #121