CoatingsPro Magazine

SEP 2018

CoatingsPro offers an in-depth look at coatings based on case studies, successful business operation, new products, industry news, and the safe and profitable use of coatings and equipment.

Issue link: https://coatingspromag.epubxp.com/i/1022837

Contents of this Issue

Navigation

Page 38 of 83

COATINGSPRO SEPTEMBER 2018 39 turnaround, meant that Wexford had to find coating products that could cure in less than optimum conditions. According to Roach, temperatures inside the buildings never reached higher than 63 degrees (17.2 °C). "We had to pick and choose what we were using," Roach said. "W hen you get to that 50 degree [10.0 °C] mark — under that 60 degree [15.6 °C] number — you really eliminate a lot of products." e products they decided on were fast-cure materials by General Polymers (GP), which could cure quickly, even in those lower temperatures. But before they could get to the coatings, the crew first had to prep. ey used a Blastrac 15" (38.1 cm) unit for the open areas on the first day of prep. e crew used the shot blaster along with a Blastpro 954 high-efficiency particulate air (HEPA) vacuum and Ervin Industries 390 steel shot distributed from the Warehouse Rentals & Supplies. On the second day of prep, they used Metabo units around the edges. e prep equipment was powered by a generator rented from Absolute Equipment. And as combined efforts, the team was aiming to achieve an International Concrete Repair Institute (ICRI) Concrete Surface Profile (CSP) 3–4. For safety during this stage, Roach assured that full-face The crew dealt with moisture using Allied Construction Technologies 2170 Fast Cure as a primer. That was squeegeed and backrolled before moving onto the intermediate coat. Wexford Contracting was brought into the project by ImageWorks Painting, which works on the vertical and ceiling work while Wexford focuses on the flooring details. They've collaborated for three years. JOB AT A GLANCE PROJECT: Coat the floors of two new storage facilities with epoxy-based systems COATINGS CONTRACTOR: Wexford Contracting 200 Halstead Blvd. Zelienople, PA 16063 (724) 452-0500 www.wexfordcontracting.com SIZE OF CONTRACTOR: 13 crew members SIZE OF CREW: 4–6 crew members for each floor PRIME CLIENT: Beyond Self Storage/NorthPoint Development NW 41st St., Ste. 500 Riverside, MO 64150 (816) 888-7380 www.beyondselfstorage.com SUBSTRATE: Concrete CONDITION OF SUBSTRATE: New SIZE OF JOB: 6,163 sq. ft. (572.6 m²) total; Robinson Twp. was 4,413 sq. ft. (410.0 m²) and Ross Twp. was 1,750 sq. ft. (162.6 m²) DURATION: 8 days UNUSUAL FACTORS/CHALLENGES: » The crew had to choose a coating system that could cure quickly below 60 degrees (15.6 °C). » The Robinson Township floor had fiber in it, which the crew wasn't aware of until they arrived on site. » There were a few discrepancies with the paint line plans once enlarged. MATERIALS/PROCESSES: » Prepped with a Blastrac 15" (38.1 cm) unit, Blastpro 954 high-efficiency particulate air (HEPA) vacuum, and Ervin Industries 390 steel shot as well as Metabo units on edges to achieve an International Concrete Repair Institute (ICRI) Concrete Surface Profile (CSP) 3–4 » Used a weed burner on fibers on the Robinson Township floor » Squeegeed and back rolled Allied Construction Technologies (AC Tech) 2170 Fast Cure (FC) at 110–120 sq. ft. per gal. (2.7–2.9 m²/L) » Squeegeed and back rolled General Polymers (GP) 3526 at an average of 150 sq. ft. per gal. (3.7 m²/L), broadcast 20-40 mesh sand, and cleaned up excess sand with a SASE Bull 300 vacuum » Squeegeed and back rolled GP 4850 polyaspartic topcoat at an average of 100 sq. ft. per gal. (2.5 m²/L) » Pulled tape off edges and columns for a clean edge » Taped and rolled drive lines and cross hatching SAFETY CONSIDERATIONS: » Wore personal protective equipment (PPE), such as gloves, safety glasses, ear plugs, and steel-toed boots

Articles in this issue

Links on this page

Archives of this issue

view archives of CoatingsPro Magazine - SEP 2018