CoatingsPro Magazine

SEP 2016

CoatingsPro offers an in-depth look at coatings based on case studies, successful business operation, new products, industry news, and the safe and profitable use of coatings and equipment.

Issue link: http://coatingspromag.epubxp.com/i/720777

Contents of this Issue

Navigation

Page 45 of 84

COATINGSPRO SEPTEMBER 2016 45 formal title for FlorLine is operations manager. He led a crew of six to seven people hailing from Ohio. And much like some basketball team strategies, each member had a specific role. ere was a guy who mixed the coatings, two guys dedicated to hand rolling on the 4-inch-tall (10.2 cm) coving, two guys to push roll the floors, and McCoy, who helped trowel and oversee the project. ere was no ball hogging on this court! McCoy was also sure to keep constant communication with his crew throughout the job, which lasted a total of about two weeks. He relied on toolbox talks and cell phones to get the play-by-play from his crew members. at was important, especially considering the approximately 3,300-square-foot (306.6 m²) project, with 1,500 linear feet (457.2 m) on the base, was spread out in nine rooms over four floors. From the first to the fourth floor, the locker room shower areas needed to be covered. "Before we started every morning, I kinda told everybody, 'Here's where you're going, here's what you're doing, I' ll commu- nicate with you in a few hours,'" McCoy said. "We have the meeting first thing in the morning to make sure everybody went where they needed to go. If there were issues, they called me or I called them." e cell phones worked. Part of the success of the communication between McCoy and his crew could be attributed to trust. McCoy has worked for FlorLine for 30+ years, and many of the guys on this project have been there for at least 10 years, according to him. "Everybody kinda knows what's expected of them; I didn't have any new trainees on this job," he explained. Four-Point Play e installation, although located up and down the three flights of stairs, covered the same process despite each room's location: primer, basecoat with chips, and two seal coats. Wearing hard hats, goggles, gloves, and bright orange shirts to make the crew members highly visible to other trades, they started by re-pitching the newly poured concrete floors. The first step for the 6- to 7-person FlorLine coatings crew was to prepare the new, 3,300 square-foot (306.6 m²) concrete surfaces. They used hand grinders from DeWalt to profile the surface. JOB AT A GLANCE PROJECT: Coat nine locker room area floors at a brand new athletic facility in Washington, D.C. COATINGS CONTRACTOR: FlorLine Group 800 Vista Ave. SE Massillon, Ohio 44646 (330) 830-3380 www.florline.com SIZE OF CONTRACTOR: ~12 people SIZE OF CREW: 6–7 crew members PRIME CLIENT: Georgetown University 3700 O St. NW Washington, D.C. 20057 (202) 687-3600 www.georgetown.edu SUBSTRATE: Concrete CONDITION OF SUBSTRATE: New SIZE OF JOB: 3,300 sq. ft. (306.6 m²) project; 1,500 linear ft. (457.2 m) DURATION: ~2 weeks UNUSUAL FACTORS/CHALLENGES: » The crew came in to replace another coatings crew, and they were asked to make up for lost time. » The project crossed four stories and there was only one elevator, so the crew carried a lot of the material up the stairs. » Another tradesperson walked onto a newly coated floor. » Communication with other trades could be challenging. » Parking the crew's two trucks was a challenge on the busy school and neighborhood streets. MATERIALS/PROCESSES: » Used DeWalt's D28474 to hand grind the concrete to a profile of 36-grit sandpaper » Applied 5–6 mils (127.0-152.4 microns) of the MasterTop SRS 41P primer » Troweled on 80–90 mils (2,032.0-2,286.0 microns) of MasterTop SRS 61BC; broadcast white, gray, and blue chips by hand into the coating to the point of rejection » Roller applied two layers of the seal coat, MasterTop SRS 71TC, at approximately 8 mils (203.2 microns) each; added an anti-skid into the second coat SAFETY CONSIDERATIONS: » Wore hard hats, goggles, gloves, and bright orange shirts » Wore ear plugs and 3M respirators while grinding » Wore knee pads or spike covers while hand rolling

Articles in this issue

Links on this page

Archives of this issue

view archives of CoatingsPro Magazine - SEP 2016