CoatingsPro Magazine

MAY 2017

CoatingsPro offers an in-depth look at coatings based on case studies, successful business operation, new products, industry news, and the safe and profitable use of coatings and equipment.

Issue link: https://coatingspromag.epubxp.com/i/818907

Contents of this Issue

Navigation

Page 63 of 84

COATINGSPRO MAY 2017 63 explained. Each blaster, wearing Clemco's Apollo 600 Supplied- Air Respirators, was responsible for covering an entire area. According to Bloodworth, that made the blasting stage "a lot more controllable, a lot easier to make sure you weren't using too much media." With 192,000 lbs. (87.1 metric tons) of abrasive, not to mention 1,000 gallons (3,785.4 L) of primer and 10,000+ gallons (37,854.1 L) of polyurea, they had a lot riding on their calculations! Using Clemco dry blasters and 3,000-pound (1.4 metric tons) super sacks of coarse coal slag from Black Beauty, the crew worked over four days to create a surface profile. Because what went in must have come out, the crew also relied on a Bobcat and forklift to remove any and all spent abrasives and put them back into their super sacks to dispose of properly. ey also washed down the surface before moving on to the coatings, which were next on the punch list. For the coatings, the crew divvied the surface to even smaller sections: 1,100 square feet (102.2 m²) each. at helped to match each area with the 100 gallons (378.5 L) of material to cover the concrete at the right rate. Unfortunately, the delay in getting the basin clean pushed the project into the shor ter and colder days of fall — challenging for coatings applicators when atmospheric conditions can affect the materials. Once they got to the coatings portion of the job, they got right to work on surface prep. That included pressure washing with 4,000 psi (27.6 MPa) machines, scarifying, and abrasive blasting. JOB AT A GLANCE PROJECT: Empty, repair, and line the basin used for wastewater collection and disposal at a food manufacturing facility COATINGS CONTRACTOR: Southern Industrial Linings, Inc. 418 Red Bone Ridge Rd., Ste. 200 Ranger, GA 30734 (678) 910-9508 www.southernindustriallinings.com SIZE OF CONTRACTOR: 15 people SIZE OF CREW: 6-12 crew members, depending on the task PRIME CLIENT: Food manufacturing facility that wishes to remain unnamed SUBSTRATE: Concrete CONDITION OF SUBSTRATE: Cracking and deteriorating SIZE OF JOB: 115,000 sq. ft. (10,683.9 m²) DURATION: 6 weeks UNUSUAL FACTORS/CHALLENGES: » The crew had to work with an insufficient pump to remove the silt from the bottom of the pit before the facility manager bought a new one. » The basin needed to be divided into smaller sections to prep and coat, and the equipment needed to be kept up top on the perimeter. » A delay in the project caused the crew to work in the fall with shorter and colder days. » The client brought a company in to verify the overall coating thickness. MATERIALS/PROCESSES: » Prepped with pressure washers with 4,000 psi (27.6 MPa) and scarifiers » Abrasive blasted with Clemco dry blasters and 3,000-pound (1.4 metric tons) super sacks of Black Beauty's coarse coal slag; removed spent abrasives and put them back into their super sacks » Applied Rhino Linings' 101 epoxy primer with Graco's Reactor E-XP1 at 8-12 mils (203.2-304.8 microns); backrolled and broadcast slag into primer » Applied Extreme 11-50 polyurea to a minimum of 125 mils (3,175.0 microns) with 75-200 feet (22.9-61.0 m) of hose » Terminated cracks by drilling a hole and filling with polyurea, geotextile fabric, and polyurea SAFETY CONSIDERATIONS: » Wore Clemco's Apollo 600 Supplied-Air Respirators during surface prep » Wore 3M 6800 full-face respirators and Tyvek jackets when applying the polyurea

Articles in this issue

Links on this page

Archives of this issue

view archives of CoatingsPro Magazine - MAY 2017